Skip to main content Skip to search Skip to main navigation

WHO: Draft Guidance on Continuous Manufacturing

The World Health Organization (WHO) has released a draft document titled Points to Consider in Continuous Manufacturing of Pharmaceutical Products for public comment.

This document outlines key considerations for manufacturers looking to implement continuous manufacturing processes in the production of finished pharmaceutical products, as well as excipients and active pharmaceutical ingredients (APIs).

WHO will review the feedback and aims to prepare a working document for potential adoption by its Expert Committee on Specifications for Pharmaceutical Preparations (ECSPP) in June 2025.

The draft covers topics including risk management, control strategies, process dynamics, validation of computerized systems, and testing for verification and stability. It also addresses both the advantages and challenges associated with continuous manufacturing.

The deadline for submitting comments is March 7, 2025.


Source:

WHO: Working documents in public consultation

Meet the GMP Compliance Adviser

The GMP Compliance Adviser is the world's largest knowledge portal for quality management in the pharma business. 

The demo access is non-binding and ends automatically.

Test it now for free

You may also be interested in the following articles:

ANVISA: Expands Recognition of Foreign GMP Authorities

ANVISA: Expands Recognition of Foreign GMP Authorities

Brazilian health authority ANVISA has updated the requirements for the recognition of Equivalent Foreign Regulatory Authorities (AREE) and the administrative procedures for Good Manufacturing Practice (GMP) certification (CBPF) through Normative Instruction IN 451/2026. The aim is to streamline and accelerate regulatory processes.
Read more
EDQM: Guidance on Reporting on Disappearances of Medicinal Products

EDQM: Guidance on Reporting on Disappearances of Medicinal Products

The EDQM has published guidance supporting the implementation of Recommendation CM/Rec(2024)3 on reporting medicinal products that disappear from the legal supply chain due to theft, loss or diversion. The initiative follows a European survey that identified shortcomings in reporting and co-ordination of such incidents.

Read more
Damage Control: Complaints and Recalls

Damage Control: Complaints and Recalls

Complaint handling and product recalls are important components of the Pharmaceutical Quality System (PQS). They serve to identify defective medicinal products and ensure that appropriate measures are taken to protect patient safety, as required by law and the competent supervisory authority.

Read more
What are the Phases of a Working Cycle During a Steam Sterilisation Process?

What are the Phases of a Working Cycle During a Steam Sterilisation Process?

Here's the answer:
Read more
EMA: 9 New Nitrosamines for Appendix 1

EMA: 9 New Nitrosamines for Appendix 1

Appendix 1 of EMA’s Questions and Answers on nitrosamine impurities has been updated. This appendix contains acceptable intakes (AIs) established for N-nitrosamines.
Read more
EMA: Reduced Testing of Incoming Starting Materials is a GMP Matter

EMA: Reduced Testing of Incoming Starting Materials is a GMP Matter

The European Medicines Agency (EMA) published an update to its “Quality of Medicines: Questions and Answers – Part 2”. The revision concerns the section on “Reduced testing of incoming starting materials”.
Read more
Previous
Next