Skip to main content Skip to search Skip to main navigation

Swissmedic: Clarification on the validity of GMP certificates

Swissmedic clarified on 20 November 2020 that GMP certificates issued after routine inspections in 2017 or 2018 are valid until 2021 or until the conduct of the next routine inspection.  

The clarification was made because companies often assume that the certificates are no longer valid if the inspection took place more than three years ago. This assumption results from the European approach to GMP certificates in the EU database EudraGMDP. Currently, routine inspections are carried out in a risk-based manner due to the COVID-19 situation. Therefore the usual frequency cannot always be maintained. Further information on the currently valid authorisation and the date of the last inspection can be downloaded in an Excel file from the Swissmedic website.


Source:

Swissmedic: Validity of GMP certificates 

Meet the GMP Compliance Adviser

The GMP Compliance Adviser is the world's largest knowledge portal for quality management in the pharma business. 

The demo access is non-binding and ends automatically.

Test it now for free

You may also be interested in the following articles:

ANVISA: Expands Recognition of Foreign GMP Authorities

ANVISA: Expands Recognition of Foreign GMP Authorities

Brazilian health authority ANVISA has updated the requirements for the recognition of Equivalent Foreign Regulatory Authorities (AREE) and the administrative procedures for Good Manufacturing Practice (GMP) certification (CBPF) through Normative Instruction IN 451/2026. The aim is to streamline and accelerate regulatory processes.
Read more
EDQM: Guidance on Reporting on Disappearances of Medicinal Products

EDQM: Guidance on Reporting on Disappearances of Medicinal Products

The EDQM has published guidance supporting the implementation of Recommendation CM/Rec(2024)3 on reporting medicinal products that disappear from the legal supply chain due to theft, loss or diversion. The initiative follows a European survey that identified shortcomings in reporting and co-ordination of such incidents.

Read more
Damage Control: Complaints and Recalls

Damage Control: Complaints and Recalls

Complaint handling and product recalls are important components of the Pharmaceutical Quality System (PQS). They serve to identify defective medicinal products and ensure that appropriate measures are taken to protect patient safety, as required by law and the competent supervisory authority.

Read more
What are the Phases of a Working Cycle During a Steam Sterilisation Process?

What are the Phases of a Working Cycle During a Steam Sterilisation Process?

Here's the answer:
Read more
EMA: 9 New Nitrosamines for Appendix 1

EMA: 9 New Nitrosamines for Appendix 1

Appendix 1 of EMA’s Questions and Answers on nitrosamine impurities has been updated. This appendix contains acceptable intakes (AIs) established for N-nitrosamines.
Read more
EMA: Reduced Testing of Incoming Starting Materials is a GMP Matter

EMA: Reduced Testing of Incoming Starting Materials is a GMP Matter

The European Medicines Agency (EMA) published an update to its “Quality of Medicines: Questions and Answers – Part 2”. The revision concerns the section on “Reduced testing of incoming starting materials”.
Read more
Previous
Next