Skip to main content Skip to search Skip to main navigation
News: Covid

PIC/S: Guidance on Risk Assesment of Routine on-Site Inspections with COVID 19

PIC/S published a new guidance COVID-19 Risk Assessment for Routine On-Site Inspections” (PI 055-1) which entered into force on 15 July 2021.

The guidance is addressed to inspectors and covers the actions to be taken during the planning phase of an inspection, in consultation with the site to be inspected.

Following, the site must confirm that the necessary measures identified in the risk assessment are implemented before inspection. The document lists all points to be considered for the risk assessment of an inspector while planning. This includes a risk rating into three categories from low to high risk (unacceptable).

If facing an inspection during COVID-19, check out the required measures.


Source:

PIC/S: PI 055-1

 

Meet the GMP Compliance Adviser

The GMP Compliance Adviser is the world's largest knowledge portal for quality management in the pharma business. 

The demo access is non-binding and ends automatically.

Test it now for free

You may Also be Interested in the Following Articles

FDA Findings: Safe Aseptic Manufacturing Starts With Facility Design

FDA Findings: Safe Aseptic Manufacturing Starts With Facility Design

At the PDA/FDA Joint Regulatory Conference 2026, FDA made it clear that modern equipment alone does not ensure sterility assurance. The article examines GMP deficiencies identified during FDA inspections and the role of facility design in aseptic manufacturing.

Read more
Question of the Week | GMP-Verlag

How is Qualification Carried out in Accordance With the V-model Described in GAMP® 5?

Here's the answer:
Read more
News: Medical Devices

EMA: Harmonisation of Combination-Product Quality Assessment

EMA’s Combination Products Operational Group (COMBO) is working to improve alignment between notified body opinions (NBOps) and pharmaceutical quality assessment, according to its report on the meeting held on 8 October 2026.
Read more
PIC/S: Revision of the Framework for International Cooperation

PIC/S: Revision of the Framework for International Cooperation

PIC/S has revised the framework governing its international cooperation. The updated Pharmaceutical Inspection Co-operation Scheme, PIC/S 1/95 (Rev. 7), was adopted in Istanbul on 2 November 2026 and entered into force on the same day.
Read more
FDA Updates Framework for Coordinating Facility Evaluations and Inspections

FDA Updates Framework for Coordinating Facility Evaluations and Inspections

FDA has revised its framework for collaboration between the Center for Drug Evaluation and Research (CDER) and the Office of Inspections and Investigations (OII). Version 2.0 of the Concept of Operations (ConOps), effective October 21, 2026, supersedes the original June 2017 version.
Read more
Outsourced Activities in the GDP Environment Part III: Contract Giver and Contract Acceptor

Outsourced Activities in the GDP Environment Part III: Contract Giver and Contract Acceptor

For any outsourced GDP activity, there is a need for delimitation of responsibilities between a client (contract giver) and a contractor (contract acceptor). Read more about their roles and responsibilities in the following excerpt from GMP:KnowHow Pharmalogistics (GDP).

Read more
Previous
Next