Skip to main content Skip to search Skip to main navigation

Nitrosamine risk evaluation: Switzerland follows EU deadline extension

On 9 November 2020, Swissmedic announced to further extend the deadline for the completion of a risk evaluation for medicinal products for human use with a risk of nitrosamine formation or (cross)contamination to 31 March 2021. For biological medicinal products, the final date for the completion of an evaluation is 1 July 2020. Switzerland is thus following the EU, which announced an extension of the deadline in early October.
 

Due to the COVID-19 crisis a majority of affected companies did not manage to complete the required risk evaluation (step 1 risk evaluation) as of 1 October 2020, the specified deadline. Those companies will now have more time to review their manufacturing processes and carry out the required risk evaluation. The deadlines for steps 2 and 3 (confirmatory tests and changes to the marketing authorization) currently remain unchanged: October 1, 2022 for synthetics and July 1, 2023 for biologicals.

In difference to the EU, Switzerland does not require

  • a submission of any documentation once the risk evaluation has been completed. However, the evaluation must be available in the course of inspections.
  • any general risk assessments for biologicals, but investigations will be called for when there are identifiable risk factors.

Source:

Swissmedic: News and Updates

EMA: Nitrosamine impurities

Meet the GMP Compliance Adviser

The GMP Compliance Adviser is the world's largest knowledge portal for quality management in the pharma business. 

The demo access is non-binding and ends automatically.

Test it now for free

You may also be interested in the following articles:

EMA: Q&A Paper on Measures to Prevent Microbial Contamination of Non-Sterile Medicinal Products

EMA: Q&A Paper on Measures to Prevent Microbial Contamination of Non-Sterile Medicinal Products

The EMA has published a new Q&A paper on technical and organisational measures to prevent microbial contamination of non-sterile medicinal products.
Read more
When APS Fail and First Air is at Risk

When APS Fail and First Air is at Risk

At the PDA Good Aseptic Manufacturing Conference 2026, Alberto Gonzales (Takeda) discussed challenges and practical solutions related to aseptic process simulations (APS). Anna Campanella (Takeda) and Hussein Bachir (Franz Ziel) explored how first air protection in aseptic processing can be compromised by equipment design, glove interventions, and operator activities.
Read more
Why is import authorisation necessary for medicinal products entering the EU?

Why is import authorisation necessary for medicinal products entering the EU?

Read more
FDA: Updated Compliance Program for Preapproval Inspections

FDA: Updated Compliance Program for Preapproval Inspections

The FDA has revised its Compliance Program 7346.832, “Preapproval Inspections”. The updated program describes the planning, conduct and evaluation of preapproval inspections (PAIs) for New Drug Applications (NDAs) and Abbreviated New Drug Applications (ANDAs).
Read more
EMA: Revised Q&A MRA EU-USA

EMA: Revised Q&A MRA EU-USA

The EMA has updated its Questions and Answers on the EU-US Mutual Recognition Agreement (MRA). The update follows the completion of the FDA's assessment of all EU authorities responsible for GMP inspections of veterinary medicinal products on 29 May 2026.
Read more
WHO: Draft on Regulatory Ovesight of Disposal of Medical Products

WHO: Draft on Regulatory Ovesight of Disposal of Medical Products

WHO published a draft consultation document on regulatory oversight of disposal of medical products throughout the lifecycle.
Read more
Previous
Next