Skip to main content Skip to search Skip to main navigation

EMA: New Q&A on nitrosamine impurities for marketing authorisation holders

Shortly after the publication of the EMA's final assessment report on nitrosamine impurities in medicinal products (we reported), a 15-page Q&A for marketing authorisation holders and applicants was published on 6 August 2020.

It replaces the document 'Information on nitrosamines for marketing authorisation holders' EMA/428592/2019 published in September 2019, which was withdrawn.   

 

The 18 questions and answers on the topic of "risk assessment" deal with the expectations that will be placed on marketing authorisation holders and applicants in the future. They are intended to

  • design their manufacturing processes and controls to prevent if possible or mitigate as much as possible the presence of N-nitrosamines in their API and FP(s); 
  • assess the risk of presence nitrosamine impurities in their API(s) and FP(s) and introduce any resultant changes to the dossier as needed (e.g. changes to their manufacturing processes); 
  • ensure that active substances and excipients used in their FPs are manufactured in compliance with good manufacturing practices in line with Article 46(f) of Directive 2001/83/EC. 

 

What's new?

While in September 2019 the "Call for Review" concentrated on impurities in chemically synthesized active pharmaceutical ingredients, biological APIs must now also be reviewed. In particular these are

  • biologicals containing chemically synthesised fragments, where risk factors similar to chemically synthesised active substances are present;
  • biologicals using processes where nitrosating reagents are deliberately added;  
  • biologicals packaged in certain primary packaging material, such as blister packs containing nitrocellulose. 

The "Call for Review" is divided into three steps.:

  • Step 1: Risk evaluation   
  • Step 2: If a risk exists, confirmatory tests must be performed and the results must be reported immediately.  
  • Step 3: If the presence of nitrosamines is confirmed, variations to reduce the risk should be submitted.  

 

Important deadlines for marketing authorisation holders to submit the results from step 1: 

  • for products containing chemically synthesised APIs: until 31 March 2021  
  • for products containing biological APIs: until 1 July 2021 

 

The Q&A also provides answers to questions on the following points:  

  • Currently known causes for the presence of nitrosamines 
  • Procedure after completion of steps 1 and 2 if new information becomes available   
  • Prioritization of certain factors in the risk assessment 
  • Performance of the risk assessment 
  • Conduction of the confirmatory tests 
  • Requirements for the analytical methods 
  • Limits for nitrosamines 
  • What-To-Do after detection of nitrosamine contamination 
  • Mitigation measures 
  • Changes required for marketing authorisations 
  • Procedure for new and existing marketing authorisation applications 
  • Information on the time of inclusion of a test for nitrosamines in the authorisation dossier 
  • Responsibilities of marketing authorisation holders for active substances with Certificates of Suitability (CEPs) and Active Substance Master Files (ASMFs)

Sources:

EMA: Nitrosamine Website

EMA: Questions and answers for marketing authorisation holders/applicants on the CHMP Opinion for the Article 5(3) of Regulation (EC) No 726/2004 referral on nitrosamine impurities in human medicinal products

Meet the GMP Compliance Adviser

The GMP Compliance Adviser is the world's largest knowledge portal for quality management in the pharma business. 

The demo access is non-binding and ends automatically.

Test it now for free

You may also be interested in the following articles:

ANVISA: Expands Recognition of Foreign GMP Authorities

ANVISA: Expands Recognition of Foreign GMP Authorities

Brazilian health authority ANVISA has updated the requirements for the recognition of Equivalent Foreign Regulatory Authorities (AREE) and the administrative procedures for Good Manufacturing Practice (GMP) certification (CBPF) through Normative Instruction IN 451/2026. The aim is to streamline and accelerate regulatory processes.
Read more
EDQM: Guidance on Reporting on Disappearances of Medicinal Products

EDQM: Guidance on Reporting on Disappearances of Medicinal Products

The EDQM has published guidance supporting the implementation of Recommendation CM/Rec(2024)3 on reporting medicinal products that disappear from the legal supply chain due to theft, loss or diversion. The initiative follows a European survey that identified shortcomings in reporting and co-ordination of such incidents.

Read more
Damage Control: Complaints and Recalls

Damage Control: Complaints and Recalls

Complaint handling and product recalls are important components of the Pharmaceutical Quality System (PQS). They serve to identify defective medicinal products and ensure that appropriate measures are taken to protect patient safety, as required by law and the competent supervisory authority.

Read more
What are the Phases of a Working Cycle During a Steam Sterilisation Process?

What are the Phases of a Working Cycle During a Steam Sterilisation Process?

Here's the answer:
Read more
EMA: 9 New Nitrosamines for Appendix 1

EMA: 9 New Nitrosamines for Appendix 1

Appendix 1 of EMA’s Questions and Answers on nitrosamine impurities has been updated. This appendix contains acceptable intakes (AIs) established for N-nitrosamines.
Read more
EMA: Reduced Testing of Incoming Starting Materials is a GMP Matter

EMA: Reduced Testing of Incoming Starting Materials is a GMP Matter

The European Medicines Agency (EMA) published an update to its “Quality of Medicines: Questions and Answers – Part 2”. The revision concerns the section on “Reduced testing of incoming starting materials”.
Read more
Previous
Next