Skip to main content Skip to search Skip to main navigation

EMA: New Q&A on nitrosamine impurities for marketing authorisation holders

Shortly after the publication of the EMA's final assessment report on nitrosamine impurities in medicinal products (we reported), a 15-page Q&A for marketing authorisation holders and applicants was published on 6 August 2020.

It replaces the document 'Information on nitrosamines for marketing authorisation holders' EMA/428592/2019 published in September 2019, which was withdrawn.   

 

The 18 questions and answers on the topic of "risk assessment" deal with the expectations that will be placed on marketing authorisation holders and applicants in the future. They are intended to

  • design their manufacturing processes and controls to prevent if possible or mitigate as much as possible the presence of N-nitrosamines in their API and FP(s); 
  • assess the risk of presence nitrosamine impurities in their API(s) and FP(s) and introduce any resultant changes to the dossier as needed (e.g. changes to their manufacturing processes); 
  • ensure that active substances and excipients used in their FPs are manufactured in compliance with good manufacturing practices in line with Article 46(f) of Directive 2001/83/EC. 

 

What's new?

While in September 2019 the "Call for Review" concentrated on impurities in chemically synthesized active pharmaceutical ingredients, biological APIs must now also be reviewed. In particular these are

  • biologicals containing chemically synthesised fragments, where risk factors similar to chemically synthesised active substances are present;
  • biologicals using processes where nitrosating reagents are deliberately added;  
  • biologicals packaged in certain primary packaging material, such as blister packs containing nitrocellulose. 

The "Call for Review" is divided into three steps.:

  • Step 1: Risk evaluation   
  • Step 2: If a risk exists, confirmatory tests must be performed and the results must be reported immediately.  
  • Step 3: If the presence of nitrosamines is confirmed, variations to reduce the risk should be submitted.  

 

Important deadlines for marketing authorisation holders to submit the results from step 1: 

  • for products containing chemically synthesised APIs: until 31 March 2021  
  • for products containing biological APIs: until 1 July 2021 

 

The Q&A also provides answers to questions on the following points:  

  • Currently known causes for the presence of nitrosamines 
  • Procedure after completion of steps 1 and 2 if new information becomes available   
  • Prioritization of certain factors in the risk assessment 
  • Performance of the risk assessment 
  • Conduction of the confirmatory tests 
  • Requirements for the analytical methods 
  • Limits for nitrosamines 
  • What-To-Do after detection of nitrosamine contamination 
  • Mitigation measures 
  • Changes required for marketing authorisations 
  • Procedure for new and existing marketing authorisation applications 
  • Information on the time of inclusion of a test for nitrosamines in the authorisation dossier 
  • Responsibilities of marketing authorisation holders for active substances with Certificates of Suitability (CEPs) and Active Substance Master Files (ASMFs)

Sources:

EMA: Nitrosamine Website

EMA: Questions and answers for marketing authorisation holders/applicants on the CHMP Opinion for the Article 5(3) of Regulation (EC) No 726/2004 referral on nitrosamine impurities in human medicinal products

Meet the GMP Compliance Adviser

The GMP Compliance Adviser is the world's largest knowledge portal for quality management in the pharma business. 

The demo access is non-binding and ends automatically.

Test it now for free

You may also be interested in the following articles:

ICH: Updated Q9(R1) Briefing Pack

ICH: Updated Q9(R1) Briefing Pack

The ICH has fully revised the Q9(R1) Briefing Pack (March/April 2026) to align with the updated ICH Q9 guideline.
Read more
EMA: New Plans for the EU GMP Guide

EMA: New Plans for the EU GMP Guide

EMA published the GMDP Inspectors Working Group’s new 2026-2028 work plan and its 2025 annual report.
Read more
EMA: Pharmaceutical Quality System (PQS) Effectiveness Pilot Project

EMA: Pharmaceutical Quality System (PQS) Effectiveness Pilot Project

EMA launched a pilot under which EEA GMP inspectors will assess how sites demonstrate the effectiveness of their pharmaceutical quality system for risk-based change management, and whether the EEA GMP certificate could serve as the main evidence of this effectiveness.
Read more
EMA: Updated Guideline on Active Substance Chemistry

EMA: Updated Guideline on Active Substance Chemistry

The EMA has updated guidance on the information required for the manufacture and control of active substances used in medicinal products, with a 1 September 2026 date of application.
Read more
EMA: Q&A on the Implementation of 3DP Technology for Solid Oral Dosage Forms

EMA: Q&A on the Implementation of 3DP Technology for Solid Oral Dosage Forms

EMA added a new GMP/Q&A section on its website and published a dedicated Q&A document on 3D printing (3DP) for solid oral dosage forms.
Read more
Microbiological Monitoring – Sources of Contamination

Microbiological Monitoring – Sources of Contamination

All pharmaceutical dosage forms must be manufactured under controlled microbiological conditions. This requires microbial monitoring. This applies not only to sterile manufacturing, but also to facilities that manufacture non-sterile products.
Read more
Previous
Next