Skip to main content Skip to search Skip to main navigation

EMA: New Q&A on nitrosamine impurities for marketing authorisation holders

Shortly after the publication of the EMA's final assessment report on nitrosamine impurities in medicinal products (we reported), a 15-page Q&A for marketing authorisation holders and applicants was published on 6 August 2020.

It replaces the document 'Information on nitrosamines for marketing authorisation holders' EMA/428592/2019 published in September 2019, which was withdrawn.   

 

The 18 questions and answers on the topic of "risk assessment" deal with the expectations that will be placed on marketing authorisation holders and applicants in the future. They are intended to

  • design their manufacturing processes and controls to prevent if possible or mitigate as much as possible the presence of N-nitrosamines in their API and FP(s); 
  • assess the risk of presence nitrosamine impurities in their API(s) and FP(s) and introduce any resultant changes to the dossier as needed (e.g. changes to their manufacturing processes); 
  • ensure that active substances and excipients used in their FPs are manufactured in compliance with good manufacturing practices in line with Article 46(f) of Directive 2001/83/EC. 

 

What's new?

While in September 2019 the "Call for Review" concentrated on impurities in chemically synthesized active pharmaceutical ingredients, biological APIs must now also be reviewed. In particular these are

  • biologicals containing chemically synthesised fragments, where risk factors similar to chemically synthesised active substances are present;
  • biologicals using processes where nitrosating reagents are deliberately added;  
  • biologicals packaged in certain primary packaging material, such as blister packs containing nitrocellulose. 

The "Call for Review" is divided into three steps.:

  • Step 1: Risk evaluation   
  • Step 2: If a risk exists, confirmatory tests must be performed and the results must be reported immediately.  
  • Step 3: If the presence of nitrosamines is confirmed, variations to reduce the risk should be submitted.  

 

Important deadlines for marketing authorisation holders to submit the results from step 1: 

  • for products containing chemically synthesised APIs: until 31 March 2021  
  • for products containing biological APIs: until 1 July 2021 

 

The Q&A also provides answers to questions on the following points:  

  • Currently known causes for the presence of nitrosamines 
  • Procedure after completion of steps 1 and 2 if new information becomes available   
  • Prioritization of certain factors in the risk assessment 
  • Performance of the risk assessment 
  • Conduction of the confirmatory tests 
  • Requirements for the analytical methods 
  • Limits for nitrosamines 
  • What-To-Do after detection of nitrosamine contamination 
  • Mitigation measures 
  • Changes required for marketing authorisations 
  • Procedure for new and existing marketing authorisation applications 
  • Information on the time of inclusion of a test for nitrosamines in the authorisation dossier 
  • Responsibilities of marketing authorisation holders for active substances with Certificates of Suitability (CEPs) and Active Substance Master Files (ASMFs)

Sources:

EMA: Nitrosamine Website

EMA: Questions and answers for marketing authorisation holders/applicants on the CHMP Opinion for the Article 5(3) of Regulation (EC) No 726/2004 referral on nitrosamine impurities in human medicinal products

Meet the GMP Compliance Adviser

The GMP Compliance Adviser is the world's largest knowledge portal for quality management in the pharma business. 

The demo access is non-binding and ends automatically.

Test it now for free

You may also be Interested in the Following Articles:

What is a gas?

What is a gas?

You can view the answer here:
Read more
EDQM: New Ph. Eur. Chapter on Data Quality with a Focus on Digital Data

EDQM: New Ph. Eur. Chapter on Data Quality with a Focus on Digital Data

The European Pharmacopoeia (Ph. Eur.) has introduced a new general chapter that provides a framework for managing the quality of data, including digital data, throughout its life cycle.

Read more
EMA: Pilot Programme for Breakthrough Devices

EMA: Pilot Programme for Breakthrough Devices

The EMA plans to launch a pilot programme in Q2 2026 to implement the guidance for breakthrough devices issued in December 2025.

Read more
PIC/S: Jordan FDA Joins PIC/S

PIC/S: Jordan FDA Joins PIC/S

On 1 January 2026, the Jordan Food & Drug Administration (JFDA) became the 57th PIC/S Participating Authority.

Read more
Swissmedic: Scientific GMDP Meetings

Swissmedic: Scientific GMDP Meetings

Swissmedic offers companies holding or seeking a Swissmedic manufacturing or distribution license the opportunity to discuss project-specific GMP and GDP topics in Scientific GMDP Meetings.

Read more
Purified Water – The new Chinese Pharmacopoeias and What Happens Next?

Purified Water – The new Chinese Pharmacopoeias and What Happens Next?

A new Chinese Pharmacopoeia was published in 2025. This has some significant implications for the pharmaceutical water industry, which we will discuss in more detail in this article. Firstly, it is important to note that cold WFI systems are now permitted worldwide and can be used across the board.
Read more
Previous
Next