Skip to main content Skip to search Skip to main navigation
News: EMA

EMA: 3 new Q&As on EU GMP Annex 1

The EMA has published 3 new or updated questions and answers on Annex 1 of the EU GMP Guide. They deal with bioburden levels and sampling, and open versus closed isolators. The answers are summarised below:

What is the maximum acceptable bioburden level?

The specification limits for bioburden should be NMT 10 CFU/100 ml, in line with the guideline “sterilisation-medicinal-product and active-substance ref EMA/CHMP/CVMP/QWP/850374/2015)". This applies also when a prefilter is installed. Exceptions may be considered with appropriate justification, such as processes involving fermentation or specific components, where a higher bioburden limit before prefiltration might be acceptable. In such cases, it is crucial to demonstrate that the first filter can achieve a bioburden limit before the last filtration of NMT 10 CFUs/100 ml, aligning with notes for guidance on manufacture of the finished dosage form (CPMP/QWP/486/95 and EMEA/CVMP/126/95).

Is rapid method valid for the detection of microorganism within grade A and B?

Rapid method is one of the alternative monitoring systems that may expedite the detection of microorganisms pending that the requirements of annex 1 points 9.28, 9.30 and 9.31) are fulfilled.

Is an isolator considered as a „closed isolator“ if the semi-continuous ingress and/or egress of materials during operations isconducted via reproducible biodecontamination steps?

The answer discusses the distinction between two types of isolators outlined in Annex 1. Closed isolator systems prevent external contamination by using aseptic connections to auxiliary equipment, remaining sealed throughout operations. Open isolator systems, on the other hand, allow continuous material transfer through engineered openings, maintaining isolation through measures like continuous overpressure.

An isolator interfacing with a material transfer airlock that uses a reproducible bio-decontamination steps (active vapor-phase hydrogen peroxide (VPHP) decontamination) may be considered a closed isolator if it effectively prevents external contamination, supported by qualification/validation studies and monitoring data. Specific considerations include the validation of VPHP cycles and protection of the filling chamber environment by a sealed door during loading and decontamination. However, it is important to discuss these elements with the competent authority.

What are the requirements for the bioburden sampling to support parametric release?

Annex 1 and Annex 17 emphasise the need for a pre-sterilisation bioburden monitoring program to support parametric release of products. Both documents stress the importance of developing such a program, performing bioburden assays for each batch (or sub-batch), and selecting sampling locations based on worst-case scenarios representative of the batch. Identification of any organisms found during testing is crucial.

Companies are advised to consider the bioburden on a batch or sub-batch level, with careful consideration of the time between sampling, sterilisation, and testing. Any alternative approaches should be thoroughly justified, taking into account materials involved, homogeneity of bioburden within sub-batches, presence of organisms, and the time elapsed between sampling and sterilisation.


Source:

EMA GMP Q&As

Meet the GMP Compliance Adviser

The GMP Compliance Adviser is the world's largest knowledge portal for quality management in the pharma business. 

The demo access is non-binding and ends automatically.

Test it now for free

You may Also be Interested in the Following Articles

News: ICH

ICH: Adoption of the ICH Q1 Stability Guideline

The Assembly of the International Council for Harmonisation of Technical Requirements for Pharmaceuticals for Human Use (ICH) met on 17-18 November 2026 in Prague, Czechia for its biannual meeting. ICH announced, among other things, adoption of ICH Q1: Stability Testing of Drug Substances and Drug Products as a final harmonised guideline.
Read more
FDA Expands Sampling and Testing of Marketed Medicines

FDA Expands Sampling and Testing of Marketed Medicines

Through its Enhanced Approach for Sampling and Testing (EAST) program, the US Food and Drug Administration combines rapid analytical techniques with established testing methods. The agency aims to test more medicines from US and overseas manufacturers, detect potential quality issues earlier, and use the findings to inform risk-based inspection planning.
Read more
FDA Findings: Safe Aseptic Manufacturing Starts With Facility Design

FDA Findings: Safe Aseptic Manufacturing Starts With Facility Design

At the PDA/FDA Joint Regulatory Conference 2026, FDA made it clear that modern equipment alone does not ensure sterility assurance. The article examines GMP deficiencies identified during FDA inspections and the role of facility design in aseptic manufacturing.

Read more
Question of the Week | GMP-Verlag

How is Qualification Carried out in Accordance With the V-model Described in GAMP® 5?

Here's the answer:
Read more
News: Medical Devices

EMA: Harmonisation of Combination-Product Quality Assessment

EMA’s Combination Products Operational Group (COMBO) is working to improve alignment between notified body opinions (NBOps) and pharmaceutical quality assessment, according to its report on the meeting held on 8 October 2026.
Read more
PIC/S: Revision of the Framework for International Cooperation

PIC/S: Revision of the Framework for International Cooperation

PIC/S has revised the framework governing its international cooperation. The updated Pharmaceutical Inspection Co-operation Scheme, PIC/S 1/95 (Rev. 7), was adopted in Istanbul on 2 November 2026 and entered into force on the same day.
Read more
Previous
Next