How is Qualification Carried out in Accordance With the V-model Described in GAMP® 5?
The V-model consists of the design phase, in which the requirements are defined (left-hand branch), and the specification phase, in which the requirements are verified (right-hand branch). Risk assessments must also be carried out during the specification phase. The 'tip' of the V-model corresponds to the construction and installation of the plant and the associated acceptance tests.
Would you Like to Discover More?
The GMP Compliance Adviser is the world's largest knowledge portal for quality management in the pharma business.
The free demo access is non-binding and ends automatically after 7 days.