Skip to main content Skip to search Skip to main navigation
EMA: Pharmaceutical Quality System (PQS) Effectiveness Pilot Project

EMA: Pharmaceutical Quality System (PQS) Effectiveness Pilot Project

EMA launched a pilot under which EEA GMP inspectors will assess how sites demonstrate the effectiveness of their pharmaceutical quality system for risk-based change management, and whether the EEA GMP certificate could serve as the main evidence of this effectiveness.

The pilot will mainly include manufacturing sites producing sterile and / or non-sterile finished products and biological API sites.

The pilot explicitly uses PIC/S guidance PI 054-1 How to Evaluate and Demonstrate the Effectiveness of the Pharmaceutical Quality System with regard to Risk-based Change Management as its assessment basis and will run in selected GMP inspections during 2026-2027.

The GMDP Inspectors Working Group is inviting marketing authorisation holders and manufacturers to nominate their sites for onsite PQS effectiveness assessments by EEA GMP inspectors.


Source:

EMA: Pharmaceutical quality system (PQS) effectiveness pilot project

Meet the GMP Compliance Adviser

The GMP Compliance Adviser is the world's largest knowledge portal for quality management in the pharma business. 

The demo access is non-binding and ends automatically.

Test it now for free

You may also be interested in the following articles:

How can the Specific Requirements for Sterile Products be Taken into Account in the Quality Management System?

How can the Specific Requirements for Sterile Products be Taken into Account in the Quality Management System?

Here's the answer:
Read more
GMP Meets Radiation Protection – How Do They Fit Together?

GMP Meets Radiation Protection – How Do They Fit Together?

The manufacture of radiopharmaceuticals requires simultaneous compliance with the EU GMP Guide and radiation protection regulations, which can lead to conflicting objectives between product safety and personal protection. Technical solutions such as negative pressure systems and lead-lined cells, as well as early consultation with the authorities, are crucial for implementation that complies with both GMP and radiation protection requirements.
Read more
ICH: Updated Q9(R1) Briefing Pack

ICH: Updated Q9(R1) Briefing Pack

The ICH has fully revised the Q9(R1) Briefing Pack (March/April 2026) to align with the updated ICH Q9 guideline.
Read more
EMA: New Plans for the EU GMP Guide

EMA: New Plans for the EU GMP Guide

EMA published the GMDP Inspectors Working Group’s new 2026-2028 work plan and its 2025 annual report.
Read more
EMA: Pharmaceutical Quality System (PQS) Effectiveness Pilot Project

EMA: Pharmaceutical Quality System (PQS) Effectiveness Pilot Project

EMA launched a pilot under which EEA GMP inspectors will assess how sites demonstrate the effectiveness of their pharmaceutical quality system for risk-based change management, and whether the EEA GMP certificate could serve as the main evidence of this effectiveness.
Read more
EMA: Updated Guideline on Active Substance Chemistry

EMA: Updated Guideline on Active Substance Chemistry

The EMA has updated guidance on the information required for the manufacture and control of active substances used in medicinal products, with a 1 September 2026 date of application.
Read more
Previous
Next