• gmp-verlag.de
  • GMP MANUAL Login
  • Shopping cart
Stay informed!

You’d like to be regularly informed on the latest developments in Good Manufacturing Practices?

 

Subscribe to our free GMP Newsletter LOGFILE!

>>> REGISTER NOW

TOP 5 GMP Downloads

1. Questionnaire for preparing GMP-inspections
More than 650 typical questions related to audits and inspections.


2. GDP Audit Checklist
More than 700 questions with reference to regulations.


3. GMP Fundamentals
A quick and comprehensive overview of the complex world of GMP.


4. Industry Guide to handle OOX Test Results
Every single step of the OOX process.


5. The New USP <1231>: Water for Pharmaceutical Purposes
A compact overview of the contents of the new version of USP <1231>.


>>> More Downloads
GMP Compliance Adviser

GMP in Practice: 24 chapters written by internationally renowned industry experts.

 

GMP Regulations: 8 chapters with the most important GMP guidelines and regulations.

 

Image

>>> READ MORE

Award
Image
The New USP <1231>
Water for Pharmaceutical Purposes

a detailed Overview

>>> ORDER NOW

GMP LOGFILE Features

2017-09-20

LOGFILE No. 35/2017 – Technology Transfer Phases

Technology Transfer Phases

An excerpt from GMP Series A Successful Concept for Technology Transfer in Drug Manufacturing

5 minutes reading time

by Christian Gausepohl, PhD

 

The transfer of a product to a contract manufacturer can be divided into different phases. Systematic and standardised planning and implementation of the transfer helps prevent errors, repetition and failure. Examples for the individual phases are shown below (see Figure 1).

Image
Figure 1: Examples of technology transfer phases

Project request/initial evaluation

Specific information is required to ensure that the contract manufacturer can properly evaluate the project request. The factors listed in Figure 2 are examples of factors that are considered during the evaluation.

Image
Figure 2: Evaluation aspects of the project request

A comparison of the processes and technologies used at the two manufacturing locations is vital for the evaluation of the potential risks of the transfer project. The individual process steps of the sending unit and the contract manufacturer are compared. Differences in machines, systems and batch sizes are identified. These differences are an indication of the changes required for an authorisation adjustment strategy.

Project recommendation/proposal

The initial evaluation is used to create a project recommendation that is then used as a proposal for implementing the transfer project from the viewpoint of the contract manufacturer. This includes assessment aspects (Figure 17.A-12) and a rough outline of the schedule and content of the project. It is important that the content, scope and responsibilities in the transfer project are clearly specified. If necessary, the contract giver can also propose some concrete specifications for the project. Initial potential risks (e.g. for the target deadlines) can be described and possible measures identified.

After consultation, a master transfer plan for the project can be created or be defined a priori by the contract giver as a guideline. A master transfer plan usually contains:

  • scope of the transfer (process steps)
  • transfer activities and documentation
  • qualification activities
  • planned authorisation strategy for the transfer to a different manufacturing site
  • fundamental acceptance criteria for the release of the new manufacturing site (contract manufacturer)

Review by the contract giver/start of project

After the project proposal has been reviewed and evaluated by the contract giver, a decision is made on whether to proceed with the project. The project can also start if the master transfer plan is approved.

Project plan

Good project management is vital to the success of a transfer project. Detailed documentation of the product transfer is also very important. This is an important aspect of the knowledge transfer on the one hand, and it is required for the change notification of the contract manufacturer (variation to a marketing authorisation) on the other, or for the inspection carried out in the case of such a change notification. The acceptance criteria for a successful product transfer are specified in the transfer plan. If a master transfer plan is available, the requirements and contents of this master plan are described in greater detail in the transfer plan. It contains the planned and implemented steps for the transfer. Figure 3 contains a list of components that should be included in a transfer plan.

Image
Figure 3 Standard content of any technology transfer plan

It is important that the analytical transfer is given top priority to facilitate the evaluation of the production transfer steps using methods that have been successfully transferred. As a rule, this improves the ability to respond to changes or challenges in a flexible manner when it is possible to carry out the analysis of samples directly on site. In the case of multi-purpose facilities, the question of cleaning and cleaning validation must also be dealt with at an early phase of the project to reduce risks to the schedule. The bilateral approval of the transfer plan reflects mutual expectations and represents the beginning of the active transfer phase.

 

Image

Here’s an overview of what else you’ll discover in this GMP Series PDF Download:

  • Transfer of information
  • Organisation
  • Risk Management
  • Technology transfer phases
  • Product transfer challenges
  • Areas of conflict during transfer
  • Quality of the product transfer
  • Example of a transfer plan

Get started now! Order your copy of
A Successful Concept for Technology Transfer in Drug Manufacturing

Author:

Christian Gausepohl, PhD
Rottendorf Pharma GmbH, Germany